I participated the exercitation project in Kautex Cancun Plant (a joint venture between Kautex Textron and a local corporation, producing plastic fuel tanks for FAW-Volkswagen, FAW-Mazda and Shanghai GM) from July10th to August2nd. I took part in the work of several departments of the plant and the achievements are as follows.
Technical Department
visit the assembly lines
analyze the structure of PQ35as an example of the products
analyze each process of the production
audit the technical discussing of the engineers
Management Department
training of6-Sigma with DMIAC
training of7-Waste / Muda
understand the idea
audit the daily conference of the company executives
Project Department
study of process diagram of Kautex project system
project management case study
Quality Control department
watch the operation of CAQ system on the assembly line
analyze the internal problems of system failure
study some criteria of automobile industry
TS16949/ ISO14001
QS9000 / / OHSAS18001
experiments
observation of section slices of the fuel tanks
measuring the actual size of a fuel tank (PQ-35) in a three dimensional frame
Others
visit assembly line of FAW-Volkswagen Plant
This exercitation offers me practical experience and new knowledge of modern way of production and management. It is of great use in the further study and orientation of my major in the university.
Chen Shen
Summer XX
Report for Exercitation in Kautex
I participated the exercitation project in Kautex Cancun Plant (a joint venture between Kautex Textron and a local corporation, producing plastic fuel tanks for FAW-Volkswagen, FAW-Mazda and Shanghai GM) from July10th to August2nd. I took part in the work of several departments of the plant and the achievements are as follows.
Technical Department
visit the assembly lines
analyze the structure of PQ35as an example of the products
analyze each process of the production
audit the technical discussing of the engineers
Management Department
training of6-Sigma with DMIAC
training of7-Waste / Muda
understand the idea
audit the daily conference of the company executives
Project Department
study of process diagram of Kautex project system
project management case study
Quality Control department
watch the operation of CAQ system on the assembly line
analyze the internal problems of system failure
study some criteria of automobile industry
TS16949/ ISO14001
QS9000 / / OHSAS18001
experiments
observation of section slices of the fuel tanks
measuring the actual size of a fuel tank (PQ-35) in a three dimensional frame
Others
visit assembly line of FAW-Volkswagen Plant
This exercitation offers me practical experience and new knowledge of modern way of production and management. It is of great use in the further study and orientation of my major in the university.